Harmonization Study of the main design with EPM and EMP for the construction of “Designer Outlet Croatia”

Project name: Harmonisation study of the main design with environmental protection measures and environmental monitoring program for the construction in the IKEA Zagreb East zone (Shopping centre “Designer Outlet Croatia”)

Client: Designer Outlet Croatia Ltd.
Period: 12/2016 – 2/2017
Funding: Private
Location: Croatia


The project includes harmonisation of the main design with accompanying facilities, protective green area Z1, protective green area Z2, protective green area Z-a, protective green area Z-b, protective green area Z-c and protective green area Z-d with environmental protection measures and environmental monitoring program stipulated by the Decision on environmental acceptability issued by Ministry of Environmental and Nature Protection.

The study contains a description of the project from the EIA, description of the project from the main design and the analysis of compliance of each environmental protection measure and every point of the environmental monitoring program with the main design.

Photo credit: Designer Outlet Croatia
Oikon d.o.o.
Oikon d.o.o.