Technical documentation for construction of Waste Management Center and Waste Transfer Stations in Zadar County

Project name:  Technical documentation for construction of Waste Management Center and Waste Transfer Stations in Zadar County financed through EU funds:

  1. Environmental Impact Assessment Screening for Waste Transfer Station on the island of Pag
  2. Nature Impact Assessment Screening for Waste Transfer Station on the island of Pag
  3. Nature Impact Assessment Screening for Waste Transfer Station in Biograd na Moru

Client: Eko Ltd.
Period: 12/2013 – 06/2015
Location: Croatia


The project included developing an environmental impact study (EIS) for EIA screening process as well as participation in the screening procedure for environmental impact.

  • Technical description of the project,
  • Information on the current state of the environment,
  • Potential significant impacts on the environment,
  • Proposal of environmental protection measures and environmental monitoring program.

The project also included NIA scoping, which included:

  • Description of the project,
  • Information on the ecological network areas,
  • Potential significant impacts on these areas,
  • Proposal of protection measures.

Services provided:

  • Impact Analysis
  • Ecological network data collection
  • Technical description of the project,
  • Information on the current state of the environment,
  • Potential significant impacts on the environment,
  • Potential significant transboundary impact on the environment,
  • Proposal of environmental protection measures and environmental monitoring program,
  • Documentation.

Oikon d.o.o.
Oikon d.o.o.
Skip to content