Monitoring the impact of water management projects on the status of water bodies – hydromorphological monitoring in 2025

Project name: Monitoring the impact of water management projects on the status of water bodies – hydromorphological monitoring in 2025

Client: Hrvatske vode (Croatian Water Authority)

Period: 09/2025 – 07/2026
Location: Croatia


As part of the project, field research and data collection was carried out at 21 measuring stations of supervisory and/or operational monitoring, included in the Program of Harmonization of Monitoring 2022-2027. (Croatian waters, 2023), on the Kupa, Rečica, Odra, Kupčina, Korana, Mrežnica, Dobra, Drava, Stara Drava, Sava and Vučica watercourses. The monitoring was carried out in order to monitor the impact of the implementation of water management projects (including the flood protection system in the Kupa river basin, the removal of excess sediment from the Drava river, the development of the old Drava river bed and Stara Drava retention, the Prelošćica pumping station and the reconstruction of the Lukavac watercourse) on the hydromorphological state of surface water bodies.

The work included the implementation of hydromorphological monitoring of appropriate representative sections of rivers in accordance with the prescribed Methodology for monitoring and evaluating hydromorphological indicators for condition assessment (Hrvatske vode, 2024), with the use of available data and documentation (cartographic and satellite views, GIS layers, topographic and geological maps, hydrological series and data from water structures registry). Ortho-photographs of the sections were taken with an unmanned aerial vehicle, which were used for later evaluation and for future comparisons of the condition. Sediment samples were collected at three locations and laboratory analysis was made.

Based on the collected field data, an assessment of the hydromorphological condition of natural, significantly altered and artificial river sections and the hydromorphological potential of significantly altered and artificial river sections was carried out. An assessment of the hydromorphological condition was also made for homogeneous parts of water bodies or entire water bodies. Current and previous evaluations of elements (hydrology, longitudinal connectivity, morphology) and the overall state of the water body were compared for those bodies on which there was a previous evaluation.

The results of the work carried out are documented in a report containing an overview and spatial representation of the processed sections in the HTRS96 projection, a list of the equipment used, scoring results and assessments of the hydromorphological state/potential, field protocols and a database of collected data and documentation, which provides a quality basis for evaluating the ecological state of water bodies according to hydromorphological quality elements.

Oikon d.o.o.
MENU
Oikon d.o.o.
Skip to content
Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.